info@renovationservices.com(347) 455-1741
Service Area

Kitchen & Bath Remodeling in Smithtown, Long Island

11787

In Smithtown, the bathroom people want to leave behind is almost always the same one. It is the original hall bath of a colonial or the primary bath of a house from the seventies and eighties: a bathtub with a sliding glass door, tile in a color that was fashionable once, and a floor that has seen thirty years of wet feet. The family is not going to move, the neighborhood is staying put, and the room is the one thing in the house that feels like it belongs to a different decade.

For those owners, the project is simple to describe and detailed to execute. Take out the tub, build a proper shower, retile, and do it so the work lasts. Some also want the shower to be walk-in or even curbless, for comfort now and for flexibility later.

This guide, written for ZIP 11787, focuses on those decisions. It covers tub-to-shower conversions, curbless options, the kitchen work that often accompanies a bath project, and how grout haze and finishing details separate good work from great. It also explains how larger Smithtown projects are scheduled, permits, timelines and 2026 planning ranges.

Get a free estimate
Describe your Smithtown bath or kitchen and we will plan a visit and an itemized quote.
Get Your Free Estimate

1The Tub-to-Shower Conversion, Step by Step

Our dedicated guide to tub-to-shower conversion costs, tile and timelines goes into the numbers. Here is how the work unfolds in a typical Smithtown colonial.

  1. Remove the tub and surround. The tub, wall tile and often the drywall behind are taken out. Cast-iron tubs are heavy and take planning.
  2. Inspect the framing and subfloor. Years of leaks are common behind tub surrounds, so wet or rotted wood gets repaired now.
  3. Rough plumbing. The drain moves from a tub trap to a shower drain, and valve and showerhead positions are set.
  4. Build the pan. A pre-sloped base, a traditional mortar pan or a foam-board system forms the floor of the shower.
  5. Waterproof. A continuous membrane covers the pan and walls and is flood-tested before tile.
  6. Set tile. Walls, then floor, with a mosaic or small-format tile on the pan so it can follow the slope.
  7. Grout and finish. Grout, caulk at corners, glass installation and fixtures.

What changes in the room

A 60-inch tub area becomes a roomy shower, often with a bench and a niche. The vanity and toilet can stay or be upgraded. Because the footprint stays the same, the plumbing change is modest and the conversion is among the better value moves in a bathroom.

Resale and daily use

A walk-in shower is easier to clean and safer for older family members. If you still want a tub somewhere in the house, keep it in another bath. Buyers often value having one.

2Standard Curb, Low Curb or Curbless?

Once the tub is out, you can choose how the shower meets the room.

OptionLook and feelBuild complexityBest for
Standard curbTraditional, contains water wellLowerBudget-conscious conversions
Low curbEasy to step over, still contains sprayModerateMost households
CurblessSeamless, accessible, openHighestAging in place, accessibility, design-forward baths

Why the curb is the failure point

A shower curb carries water on three sides and a door load on top. Leaks start at corners and at the top edge more often than anywhere else. Our guide on how to waterproof a shower curb shows the detail, and for a curbless build see curbless shower installation.

What a curbless shower needs

  • A recess in the subfloor, or a thick-bed mortar floor with enough depth for slope
  • A continuous membrane over the whole wet area
  • A drain placed to match slope direction
  • Small-format tile or mosaics that follow the slope
  • A flood test before tile
If you may want a curbless shower within ten years, put blocking in the walls for grab bars and lower the floor now. It is far cheaper before tile than after.

3Grout Haze: The Finish Detail That Shows

You have a beautiful new shower. In the afternoon light, there is a cloudy film across the tile. That is grout haze, residue left when grout was not fully cleaned from the surface. Our guide to grout haze removal after tile installation explains the methods; here is the practical overview.

Why it happens

  • Grout left on the tile too long before wiping
  • Not enough rinse water or too many passes with a dirty sponge
  • Tile with a textured or matte surface that holds residue
  • Epoxy grout, which cures fast and needs prompt cleanup

How professionals prevent it

Work in small sections, wipe at the right time, change rinse water often and finish with a clean, damp, well-wrung sponge. Experienced installers treat the cleanup as part of grouting, not an afterthought.

How haze is removed

The right method depends on the grout. Cement grout haze often responds to a dedicated haze remover applied according to the manufacturer's instructions, followed by rinsing. Epoxy haze needs specialty products and speed. Strong acids can etch some tile and attack grout, which is why you should confirm the product with the tile and grout manufacturers before applying anything.

Choosing shower glass and fixtures

Frameless glass looks clean but is custom-fabricated and measured after tile, so it sets the finish date. Semi-frameless panels cost less and can install sooner. Pick valves with a pressure-balancing or thermostatic cartridge for steady temperature, and place the controls so you can reach them without stepping into the spray. A handheld sprayer on a slide bar helps with cleaning and with bathing children or pets. Decide on a bench, a niche and any shower lighting before walls close, since each affects framing and electrical.

4Why Smithtown Owners Hire a Licensed Contractor

A tub-to-shower conversion looks like a weekend project and behaves like a plumbing, framing, waterproofing and tile project all at once. The risk is in what you cannot see: a drain set at the wrong height, a membrane that stops short of a corner, a pan that holds a quarter inch of water because the slope is wrong. These failures hide behind finished tile until they show up as stains on a ceiling or a soft spot in a floor.

A licensed and insured contractor with an in-house design-and-build team removes those risks by running the sequence correctly. We investigate framing, set plumbing, build the pan, waterproof, flood-test, tile, grout and clean with a defined process and written scope. If the plan includes a curbless shower, we coordinate any structural work, engineering and permits.

DIY and handyman attempts commonly fail at the waterproofing and the cleanup. A kit pan without proper integration, a roll-on membrane with gaps, grout cleaned too late: each leaves problems that cost more to correct than to avoid.

N.Y. Renovation Services provides transparent, itemized pricing in a detailed written contract with no hidden fees. We handle permitting and paperwork when you ask us to, and we donate 5% of total project cost to a nonprofit of your choice. Frame a number with our bathroom renovation budget planner, then ask for a written quote.

Talk to a pro about your shower
Walk us through your Smithtown bathroom and we will explain scope, sequence and cost.
Request a Consultation

5Kitchens in Smithtown Colonials and Larger Homes

The colonial kitchen

Colonials often have a formal separation between kitchen and dining room. Many owners want a wider opening, a larger island and better storage. That calls for a structural check and often engineered plans.

Making the most of a large lot

A large lot often means a deck, patio or yard that the kitchen should connect to. Sliding or French doors, durable flooring at the threshold and a layout that places the cooking zone near the door make entertaining easier.

Cabinets, counters and tile

Backsplash tile typically runs $30 to $90 per square foot as a 2026 planning range, and installed floor tile $20 to $45 per square foot. Our tile installation guide explains how substrate, thinset and grout choices affect results.

Appliances, power and venting

Modern kitchens draw more power than those built in earlier decades. Verify panel capacity, plan the hood duct route and decide between gas and electric cooking before cabinet orders.

6Smithtown Is a Far-Service Area: What That Means for You

Smithtown sits at the outer edge of our coverage. We are direct about that. Larger kitchen and bath projects here are taken by arrangement. We plan crews, deliveries and site visits around your job and do not promise next-day availability.

For owners, the practical effects are positive. A planned start date, a single mobilization and a clear sequence suit projects of this size. Smaller repairs and one-day tasks are better handled by a local tradesperson, and we will tell you if that is the better fit.

To see how our coverage is organized, visit our Long Island renovation services overview. Neighboring towns have different considerations, from village rules in Garden City to multifamily homes in Hempstead.

7Permits, Licensing and Safety

Permits

Building permits on Long Island come from the local building department, which for Smithtown addresses is the Town of Smithtown. Requirements vary by scope, so confirm before design is final.

  • Moving or removing walls: typically yes
  • Cutting joists for a recessed curbless floor: typically yes, often with engineered plans
  • New or relocated plumbing, gas or electrical: typically yes
  • Like-for-like cosmetic updates: often no

Our guide on whether you need a permit explains the thinking, though it focuses on New York City.

Licensing

Nassau and Suffolk counties require home improvement contractor licensing through county consumer affairs. Suffolk County is the right place to verify credentials. Ask for license details and proof of insurance.

Lead-safe work

Many Smithtown homes were built before 1978. The EPA's Renovation, Repair and Painting rule requires certified firms and lead-safe practices when paid contractors disturb paint in those homes.

8Timeline

StageTypical duration
Site visit, design, selections1-4 weeks
Permit review, where requiredWeeks, scope dependent
Ordering tile, glass, fixtures2-8 weeks
Demolition and haul-away2-5 days
Repairs and rough plumbing3-7 days
Pan, waterproofing, flood test, cure3-6 days
Tile, grout, cleanup4-8 days
Glass, fixtures, punch list3-5 days
Typical on-site totalBath 3-6 weeks, kitchen 6-12 weeks

Frameless glass is usually measured after tile is set and fabricated afterward, which creates a gap before the final install. Plan on it.

92026 Planning Ranges

These are typical 2026 planning ranges for the New York metro area as of October 2026, not quotes. Building rules, access, hazardous materials, finishes and scope move prices, and a written itemized quote governs.

ItemTypical planning range
Full bathroom renovation$30,000-$60,000+
Full kitchen renovation$25,000-$85,000+
Shower and bath wall tile$30-$80 per sq ft
Installed floor tile$20-$45 per sq ft
Backsplash tile$30-$90 per sq ft
Waterproofing membrane$3-$10 per sq ft
Subfloor prep and leveling$2-$8 per sq ft
Selective demolition and haul-away$8-$30 per sq ft

Our renovation cost guide shows how scope and finishes shift totals. Curbless builds, large-format tile and natural stone push toward the upper end.

10Neighborhoods and ZIP Codes We Serve

We serve the Town of Smithtown, Suffolk County, ZIP 11787, by arrangement for larger projects.

Local housing leans toward colonials on large lots. Long driveways make deliveries and dumpsters easier, though crew parking and site access still deserve planning. Larger lots may mean septic systems or well water in some parts of town, so confirm what serves your house before moving plumbing fixtures. Basements and garages often serve as staging space during longer projects.

11How We Work

Our process is simple to describe and strict to follow.

  1. Request. Send photos, dimensions and a rough budget through the quote form.
  2. Visit. We assess framing, plumbing, moisture and access, and discuss shower options.
  3. Quote. A detailed written contract with itemized lines and named products or clear allowances.
  4. Approvals. We prepare permit paperwork with the town where required.
  5. Build. Demolition, repairs, rough-in, pan, waterproofing, flood test, tile, grout and fixtures.
  6. Handover. A walkthrough, punch list and written care instructions for tile and grout.

Because tile, flooring and interior painting are core services, finishes follow the same plan. If something unexpected appears behind the tub wall, we show you, explain the options and price any change in writing before work proceeds. One team and one contract mean one place to call if you have a question six months later.

Get your project in writing
Send your details and receive an itemized quote after a site visit.
Request a Quote

12Next Steps: Get Your Free Estimate

If you are ready to replace an old tub with a shower you will enjoy, or to rethink a colonial kitchen, tell us what you have and what you want. We will help you choose between a standard curb, a low curb and a curbless design, and show you where the money goes.

You can request your free estimate online, call (347) 455-1741 or send a text. Include photos, measurements, the age of the house and any known leaks. We are open Monday through Saturday, 8:00 AM to 5:00 PM, and Smithtown projects are scheduled by arrangement.

Call for your free estimate
Speak with our team about your Smithtown kitchen or bath.
Call (347) 455-1741
Book the estimate
Share your plans and we will schedule a visit by arrangement.
Get Your Free Estimate

Frequently Asked Questions

How much does a tub-to-shower conversion cost in Smithtown, Long Island?
As a 2026 planning range, a bathroom with a tub-to-shower conversion typically falls within the $30,000 to $60,000 or more full-bath range, depending on tile, glass and plumbing. A simpler conversion in the same footprint can cost less. A site visit and itemized quote set the number.
Do I need a permit to remodel a bathroom or kitchen in Smithtown?
Often. Permits come from the Town of Smithtown building department, and structural, plumbing, gas or electrical changes generally need review. Cosmetic updates may not. Confirm requirements with the town before starting, and ask your contractor who files.
What does a curbless shower cost compared with a standard shower?
A curbless shower usually costs more because it needs a recessed floor or thick-bed mortar, a precise slope, a specialty drain and extra waterproofing. The premium varies with framing and design. A site visit shows whether your floor structure suits the work.
What is grout haze and how do I remove it?
Grout haze is a thin film of grout residue left on tile after installation. Remove it with a product matched to the grout type, ideally within the manufacturer's window. Cement and epoxy grout need different methods, and harsh acids can damage some tile and grout.
How long does a kitchen or bathroom remodel take in Smithtown?
Typical timelines are 3-6 weeks for a bathroom and 6-12 weeks for a kitchen once permits, orders and scheduling are in place. Waterproofing cure, custom cabinets, a curbless build and hidden damage can extend the schedule. Larger jobs are scheduled by arrangement.
Do you work in Smithtown, or is it too far?
Yes, Smithtown is served by arrangement for larger projects. We plan crew scheduling, deliveries and site visits around the job rather than promising quick availability. Send details through the quote form or call (347) 455-1741 and we will confirm fit.
How do I get a quote or hire a pro for a Smithtown remodel?
Use /request-a-quote or call (347) 455-1741. N.Y. Renovation Services offers a free estimate, reviews photos and dimensions, visits when the scope is clear and sends an itemized written contract. Share your ZIP, home age and rough budget.
Stop Waiting. Start Building.
Brooklyn, Manhattan, Queens, Staten Island, Long Island and nearby NJ.
Request Your Free Estimate
CallGet a Quote