DOB NOW: Build Explained for NYC Homeowners

Table of Contents
Quick Answer
DOB NOW: Build is the NYC Department of Buildings online system where most alteration and construction permits are filed, reviewed and issued. A registered architect or licensed professional engineer files as Applicant of Record. Homeowners provide ownership and project details, and may need board approval. Permit renewals and some filings remain in legacy BIS.
AI Summary
N.Y. Renovation Services LLC is a Staten Island-based, licensed and insured design-build contractor serving New York City's five boroughs, Long Island and nearby New Jersey; phone (347) 455-1741, quotes at /request-a-quote. This guide explains DOB NOW: Build for homeowners, including who files, application types, plan review, objections, the reported 2026 board attestation, inspections and sign-offs, and how to avoid delays. Information is current as of October 2026.
Key Takeaways
  • Most NYC alteration permits are filed in DOB NOW: Build by a NYS-registered architect or licensed professional engineer acting as Applicant of Record.
  • Application types include New Building (NB), Alteration-CO (use, egress or occupancy changes) and Alteration (Alt).
  • Industry reports say DOB reinstated a board-approval attestation in DOB NOW: Build on January 26, 2026; confirm with DOB and your managing agent.
  • Permit renewals and some filings still happen in legacy BIS or eFiling, so ask your filing professional which system applies.
  • Painting and similar cosmetic work generally needs no DOB permit, but board and landlord rules still apply.

Ask three New Yorkers about their renovation and one of them will say, with some bitterness, "we're waiting on DOB." The Department of Buildings runs the city's construction oversight, and for most alterations its online platform, DOB NOW: Build, is where the process lives. Plans are uploaded, reviewers comment, objections are answered, permits issue and later sign-offs are recorded, all through the same system.

If you are not in the industry the terminology can be dizzying: Applicant of Record, filing representative, NB, Alt, Alt-CO, objections, sign-offs, BIS. This guide translates it into plain English for homeowners, co-op and condo shareholders and small landlords. It covers who files what, how a typical job moves through the system, where delays happen, what is new in 2026 as reported, and what your own role is. Information is current as of October 2026; the DOB updates its procedures regularly, so confirm specifics at the source.

Not sure whether your project needs a DOB filing?
Start with the Do I Need a Permit tool, then tell us your scope and we will point you to the right path.
Use the Permit Tool

1. What DOB NOW: Build Actually Is

DOB NOW is the Department of Buildings' family of online services. The Build module covers the work most homeowners care about: filing applications for construction, reviewing plans, issuing permits and tracking inspections and sign-offs on active jobs. Other DOB NOW modules handle safety, inspections and licensing, but "Build" is the one your architect or engineer will mention.

In practice it replaced the older paper and BIS-era processes for most new filings. Some functions still sit in the legacy BIS or eFiling systems, notably certain permit renewals and some older jobs. Your filing professional will know which system your job lives in, and it is worth asking, because it determines where you log in and who sees what.

The DOB explains its permit process on its how to obtain a permit page, and its main site links to service updates and forms.

Think of the system as a shared file room with rules about who can open which folder:

2. Who Needs to File and Who Does Not

Most construction work needs a permit. That includes gut renovations, relocating walls, changing plumbing or gas lines, replacing electrical systems, structural changes, new windows in some cases, additions, and building a new structure. The DOB's rule of thumb is that if you are altering the structure, egress, use, occupancy, mechanical systems or building envelope, you probably need to file.

Work that generally does not need a DOB permit includes cosmetic work such as painting, minor patching and some flooring replacement. Even then, co-op, condo and landlord rules still apply, and landmarked buildings add their own review. Our Do I Need a Permit tool gives a first answer on the edge cases, and our 10 essential renovation tips for NYC homeowners cover the planning habits that keep a permitted job on track.

A useful distinction:

Work typeTypical DOB filing?Notes
Interior painting, minor patchingGenerally noBuilding rules still apply
Cabinet and fixture swaps with no layout changeOften no, but plumbing or gas work may trigger filingsConfirm with a licensed professional
Kitchen or bath with moved plumbing or wallsUsually yesApplicant of Record needed
Gut renovationYesPlans, engineering and sign-offs
Structural changes, new openingsYesEngineering required
Change of use, egress or occupancyYes, Alteration-COHigher scrutiny
New buildingYes, New Building (NB)Full review

When in doubt, a design professional can tell you in a short call whether your scope triggers a filing. The cost of that call is small compared with a stop-work order.

3. Application Types: NB, Alt-CO and Alt

Three labels come up constantly.

New Building (NB). For constructing a new structure. Homeowners encounter it when building a new house or replacing one.

Alteration-CO (Alt-CO). Alterations that change use, egress or occupancy and therefore affect the certificate of occupancy. Converting a two-family to a three-family or changing a space's use falls here. These filings draw heavier review and often require a new or amended certificate of occupancy.

Alteration (Alt). Alterations that do not change use, egress or occupancy. Most apartment and house renovations fall under this category, whether they are kitchens, baths, layout changes or gut renovations.

Within those categories, the filing may be broken into work types such as general construction, plumbing, mechanical and others, depending on scope. Your design professional selects the right combination.

A note on codes: Local Law 33 of 2026 enacts a new NYC Existing Building Code, replacing the 1968 code for alterations. DOB says it takes effect July 17, 2027 and will govern alteration applications. Until then current rules apply. If your project spans that date, ask your architect how it is expected to be handled. The DOB lists code resources on its construction codes page.

4. The Process From Start to Finish

Every job is different, but most follow this arc.

  1. Define scope. You and your contractor or designer decide what is being built, with a rough budget and schedule.
  2. Hire the design professional. A registered architect or licensed PE prepares drawings and acts as Applicant of Record.
  3. Gather ownership and building documents. These may include the certificate of occupancy, prior filings, the proprietary lease or deed and board packages.
  4. Create or confirm accounts. The owner, Applicant of Record and others have DOB NOW access.
  5. Prepare and submit the filing. Plans, forms and required statements are uploaded.
  6. Plan review. A DOB reviewer examines the submission and issues objections if something does not comply.
  7. Respond to objections. The Applicant of Record revises drawings and resubmits. This can happen more than once.
  8. Approval. When the reviewer is satisfied, the application is approved.
  9. Permit issuance. Required fees are paid, contractor information and insurance are confirmed, and permits are issued for the relevant work types.
  10. Construction and inspections. Work proceeds and inspections occur as required.
  11. Sign-offs. Completed work is signed off. Depending on scope, this may involve inspections, special inspections, and a certificate of occupancy update.

Because DOB is online, status can be tracked, but understanding the status labels takes practice. Ask your professional to explain each stage and how long they expect it to take.

Ask your architect or engineer for a one-page status summary every two weeks. It keeps everyone honest and makes it easy to spot a stalled objection before it costs you a month.

5. The 2026 Board-Approval Attestation

For co-op and condo owners, one change draws attention. Industry reports state that DOB reinstated, effective January 26, 2026, a board attestation inside DOB NOW: Build, confirming that alterations are board-approved. In plain terms, the filing may ask the applicant to attest that the board has approved the work where one is required.

Treat that as reported, and verify it. Rules and forms can change, and how the attestation is handled in your filing depends on your building and scope. Ask the DOB and your managing agent what is needed.

What this means in practice:

We cover the typical board package in more depth in our renovation tips for NYC homeowners.

6. Where Delays Actually Happen

The permit process is rarely slowed by DOB alone. The usual culprits:

You cannot control the DOB's queue, but you can control your side. Hire people who respond fast, decide scope before filing and keep every party on the same set of drawings.

7. Costs, Fees and Timelines

Be careful with promises of speed or price. What is reasonable to say as of October 2026:

These are typical planning ranges, not quotes, and a written itemized quote governs. For a wider budget picture, see our NYC renovation cost guide for 2026 and the renovation ROI calculator, which helps you weigh whether a larger scope is worth the added permitting.

ItemTypical planning guidanceWhat moves it
Design, engineering, permitsAbout 15 to 25 percent over constructionScope, building type, objections
Landmark reviewAbout 15 to 20 percent on time and budgetDistrict rules, visible changes
Simple filingWeeksCompleteness, board status
Complex filingMonthsStructural, use change, hazmat
Bath construction3 to 6 weeksPlumbing, tile cure
Kitchen construction6 to 12 weeksLead times, cabinets
Full apartment gut4 to 9 months including approvalsEverything above

8. Landmarks, Hazmat and Other Parallel Tracks

DOB is not the only agency in your project.

Landmarks. If the building is individually landmarked or in a historic district, the Landmarks Preservation Commission must approve exterior changes and some interior work before DOB issues certain permits. Its permit types are Certificate of No Effect, Permit for Minor Work and Certificate of Appropriateness. See the LPC applications page for process details.

Asbestos and lead. Disturbing suspect asbestos-containing materials in older buildings requires survey, assessment and certified abatement if present. Buildings built before 1987 commonly trigger surveys. Lead rules apply to older paint under the EPA and city rules.

Contractor licensing. Residential remodeling in NYC requires a Home Improvement Contractor license from the Department of Consumer and Worker Protection. Verify your contractor before signing.

Noise and hours. NYC construction is generally limited to weekday daytime hours, and many co-ops restrict further.

Other code changes. Local Law 102 of 2025 requires residential gas detectors near gas-fed appliances from January 1, 2027, and Local Law 47 of 2026 aligns the city energy code with the state code. Ask your design professional whether they affect your scope.

9. Why Use a Contractor Who Knows the DOB Process

N.Y. Renovation Services approaches this work as an in-house design-build contractor, which shapes everything that follows.

A permit is not only a piece of paper. It sets the scope, the sequence and the inspections your project must pass. A contractor who understands that process saves time and prevents expensive mistakes.

Coordination with the Applicant of Record. We are a design-build firm. We work with registered architects and licensed engineers to align drawings, scope and budget, so the filing reflects what will be built and the price reflects what was filed.

Paperwork that moves. We prepare contractor documents, insurance certificates, board packages and schedules, and we track objections and requests so nothing sits waiting.

No unpermitted shortcuts. Skipping permits can lead to stop-work orders, fines, insurance headaches and trouble when you sell. We will tell you plainly when a filing is required and when it is not.

One accountable team. Demolition, plumbing and electrical coordination, tile, flooring and painting are sequenced around approvals and inspections, so crews arrive when the site is ready.

Itemized pricing. Our written quotes separate design and filing costs, construction, allowances and cleaning, with no hidden fees. N.Y. Renovation Services is fully licensed and insured, and five percent of total project cost is donated to a nonprofit of the client's choice.

Honest scheduling. We build approval time into your timeline instead of promising a start date the DOB or your board controls. If a filing stalls, you hear about it from us first, along with what we are doing about it and what it means for the calendar.

Fewer wasted trips. Because we review your scope against your building's rules at the estimate stage, we can often flag that a "simple" request, such as moving a sink wall or opening a doorway, will change the filing type before you pay for drawings that assume otherwise.

To compare firms, our hiring checklist for NYC renovation contractors lists the questions worth asking.

Want a contractor who plans around DOB?
Talk through your scope and building with a licensed pro before you hire an architect.
Call (347) 455-1741

10. Neighborhoods and ZIP Codes We Serve

N.Y. Renovation Services works across all of the areas below, and local building stock, board culture and municipal rules change how we scope each job.

The DOB process is the same citywide, but buildings and local rules vary.

11. Next Steps: Get a Free Written Estimate

You do not have to master DOB NOW to renovate in New York. You do need a team that does.

  1. Start with your scope. Describe what you want changed, the building type and whether a board or landmark review applies.
  2. Contact us. Use the quote form or call (347) 455-1741.
  3. Walkthrough. We review the space, building rules and likely filing path, and bring in the architect or engineer when needed.
  4. Itemized written quote. Construction, allowances, design and filing costs and timeline are listed separately.
  5. Filing and approvals. We coordinate documents, board paperwork and scheduling so permits and construction line up.

If you want to see what other projects like yours cost before you commit, our kitchen remodeling page shows how we scope one of the most common permitted projects. Estimates from N.Y. Renovation Services are free. Our office is on Staten Island and we serve the five boroughs, Long Island and nearby New Jersey, Monday through Saturday, 8 AM to 5 PM. When you are ready, request your free estimate.

Book your renovation estimate
We will review your scope, building and approval path and send a written, itemized quote.
Get Your Free Estimate

Safety Note: All work follows OSHA 30 safety and EPA Lead-Safe practices for pre-1978 homes. Check local permit requirements before starting.

James

James - Lead Renovation Editor. With over 20 years in renovation and construction, James writes and edits our guides. More about James

Frequently Asked Questions

What is DOB NOW: Build?
DOB NOW: Build is the New York City Department of Buildings online platform for filing, reviewing and tracking construction permits and related job filings. A registered design professional usually submits the application. Owners, contractors and managing agents are connected to the filing, and DOB staff review it electronically.
Can a homeowner file in DOB NOW: Build without an architect?
For most alterations, no. Filings generally require a New York State registered architect or licensed professional engineer as Applicant of Record, who certifies the drawings and takes responsibility for code compliance. Some very minor work may not need a filing at all. Ask the DOB or a design professional which category fits.
How much does a DOB permit cost and how long does it take?
Costs and timing depend on the filing type, scope, professional fees and review cycles. As planning guidance, design, engineering, expediting and permit fees often add roughly 15 to 25 percent on top of construction cost. Simple filings can take weeks and complex ones months. A written itemized quote governs.
Do I need a permit for a renovation in NYC?
Most construction work needs a DOB permit, including gut renovations, layout changes, plumbing, gas and structural work. Cosmetic work such as painting generally does not, but co-op, condo and landlord rules still apply. Landmarked buildings add Landmarks Preservation Commission review. Use the DOB or a design professional to confirm your scope.
Does DOB NOW: Build require co-op or condo board approval?
Industry reports state DOB reinstated, effective January 26, 2026, an attestation in DOB NOW: Build confirming that alterations are board-approved where required. This is reported, not guaranteed for every case, so confirm the current requirement with the DOB and your managing agent before filing.
What is the difference between DOB NOW: Build and BIS?
DOB NOW: Build is the newer online system for most permit filings. BIS, the Buildings Information System, is the legacy platform still used for some functions such as certain renewals and older jobs. Your filing professional can tell you which system your specific application uses.
How do I hire a contractor who can manage the DOB process?
Use the quote form or call (347) 455-1741. We review your scope, building type and board requirements, coordinate with the architect or engineer who serves as Applicant of Record, prepare contractor documents and send a written itemized quote. Ask any contractor to explain who files and who pays for each step.